08-13-2021, 12:36 AM
Hello,
We are evaluating RoboDK and running a test while on trial. We are attempting to import code from Fusion360.
We are able to generate a machining program that runs in simulation, generates logical code for our RV-13, and LOOKS like it should work. When we actually attempt to run the instructions on robot, the program hangs on the speed command (Spd), we've removed that command for testing and get to our first actual move position (a joint move), then RoboDK encounters an error, "Communication Error."
Exporting the code that is supposed to run when we check "Run on Robot" it is outside the memory limit for our robot so we cannot just import it, however the first few commands, including Spd run without issue including the first joints that error out on RoboDK Run on Robot.
We have attached the RoboDK File and really need to prove this software works quickly. We were supposed to have made a decision / test cut Monday, to order the software and do production by tomorrow. Our compressed time schedule makes everything else difficult, so why not this too?
Master Setup R2.rdk(Size: 4.56 MB / Downloads: 378)
We are evaluating RoboDK and running a test while on trial. We are attempting to import code from Fusion360.
We are able to generate a machining program that runs in simulation, generates logical code for our RV-13, and LOOKS like it should work. When we actually attempt to run the instructions on robot, the program hangs on the speed command (Spd), we've removed that command for testing and get to our first actual move position (a joint move), then RoboDK encounters an error, "Communication Error."
Exporting the code that is supposed to run when we check "Run on Robot" it is outside the memory limit for our robot so we cannot just import it, however the first few commands, including Spd run without issue including the first joints that error out on RoboDK Run on Robot.
We have attached the RoboDK File and really need to prove this software works quickly. We were supposed to have made a decision / test cut Monday, to order the software and do production by tomorrow. Our compressed time schedule makes everything else difficult, so why not this too?